The decision to adopt solar energy is one of the smartest long-term investments a homeowner in Rajasthan can make. However, the first and most critical question is invariably: “How much does a 3kW on-grid solar system cost in Rajasthan?”
The answer isn’t a single number. The total price of your system is the sum of various high-quality components, the essential Balance of System (BoS) equipment, installation labour, and—most importantly—the substantial government subsidy. This comprehensive guide will meticulously break down the total investment, detail the individual component costs, and explain exactly how the PM Surya Ghar Yojana drastically reduces your effective price.
Total Investment Snapshot: 3kW Solar System Price in Rajasthan

The final out-of-pocket cost for a 3kW on-grid solar system depends heavily on whether you avail the central government subsidy, the brand quality you select, and the complexity of your rooftop installation (e.g., elevation structure required).
Benchmark Price: 3kW Solar System Cost Without Subsidy
This represents the market cost of a high-quality system, often referred to as the benchmark price used for subsidy calculation.
| Cost Factor | Estimated Price Range (Without Subsidy) | Price Per Watt (Indicative) |
| 3kW On-Grid System (Total) | ₹1,90,000 to ₹2,20,000 | ₹63 to ₹73 |
| Average for Quality Installation | ~₹2,05,000 | ~₹68 |
Net Cost After Subsidy: Effective 3kW Solar System Price
Under the flagship PM Surya Ghar Muft Bijli Yojana, the Government of India provides a significant Central Financial Assistance (CFA) to homeowners installing up to 3kW capacity.
| System Capacity | Total Central Subsidy (CFA) | Net Effective Cost Range in Rajasthan |
| 3kW | ₹78,000 (Maximum Cap) | ₹1,12,000 to ₹1,42,000 |
The ₹78,000 subsidy is the single most critical factor that reduces the 3kW on-grid solar system cost in Rajasthan by over 35%. This makes the investment accessible and accelerates the payback period.
Component Breakdown: The 4 Pillars of 3kW Solar System Cost

A 3kW on-grid solar system is a sophisticated engineering solution, not just a set of panels. Your total price is distributed across four major component categories:
Pillar 1: Solar Panels (PV Modules) Cost for 3kW System
The panels convert sunlight into electricity and represent the largest portion of the system’s cost.
| Parameter | Specification for 3kW System | Estimated Cost Share (50-55%) |
| Total Wattage | 3000 Wp (or 3.2 kW to optimize panel count) | ₹95,000 to ₹1,15,000 |
| Quantity | 6 to 8 Panels (e.g., 6 x 540 Wp or 7 x 450 Wp) | |
| Technology | Mono-PERC Half-Cut is the industry standard. N-Type TOPCon is the latest, offering higher efficiency and better performance in Rajasthan’s high temperatures, justifying a slightly higher price. | |
| Area Requirement | Approximately 250 to 300 sq. ft. of shadow-free rooftop space. | |
| Key Cost Driver | Choosing between high-efficiency panels (like TOPCon) and standard Mono-PERC will drive this cost up or down. |
Pillar 2: The Solar Inverter (The Brain)
The inverter converts the DC electricity from the panels into usable AC power for your home and the grid. For on-grid systems, this is a Grid-Tied String Inverter.
| Parameter | Specification for 3kW System | Estimated Cost Share (10-15%) |
| Inverter Rating | 3 kVA or 3.3 kVA Single Phase | ₹20,000 to ₹35,000 |
| Key Features | Must be highly efficient (>97%) and comply with Central Electricity Authority (CEA) and Rajasthan DISCOM standards. Look for Wi-Fi/GPRS logging for real-time performance monitoring via a mobile app. | |
| Brand Choice | Reputable brands like Sungrow, Solis, Growatt, or Fronius often command a premium but offer better service and warranty (usually 5-10 years). |
Pillar 3: Balance of System (BoS) and Safety Components
BoS includes all the hardware and wiring necessary for safe, efficient, and durable installation. This is where quality should never be compromised, especially in Rajasthan’s harsh weather conditions.
| Component | Function and Requirement | Estimated Cost Share (15-20%) |
| Mounting Structure | Secures the panels to the roof. Hot-Dip Galvanized Iron (HDGI) or high-grade aluminium are necessary for corrosion resistance against moisture and heat. | ₹20,000 to ₹30,000 |
| AC/DC Cables | High-grade, UV-resistant cables (e.g., 4 sq. mm DC and appropriate AC cable gauge) to minimize energy loss. | ₹10,000 to ₹15,000 |
| Safety Devices (ACDB/DCDB) | Junction boxes with fuses, MCBs (Miniature Circuit Breakers), and Surge Protection Devices (SPDs) to protect the system from lightning and voltage spikes. | ₹8,000 to ₹12,000 |
| Earthing Kit | Essential for safety. Includes earthing rods, earth chemical, and copper/GI wire. | ₹5,000 to ₹8,000 |
Pillar 4: Installation, Net Metering, and Commissioning
These are the service and regulatory charges that complete the project and make it officially grid-connected.
| Service/Component | Description | Estimated Cost Share (5-10%) |
| Installation & Labour | Cost for site survey, labour, material handling, and final setup. | ₹15,000 to ₹25,000 |
| Net Metering | The Bi-Directional Net Meter is mandatory. While the physical meter is often provided by the DISCOM (JVVNL, JDVVNL, or AVVNL) at a controlled price or free, the quoted cost covers the application fee, documentation, and liaison charges with the local electricity board. | ₹5,000 to ₹10,000 |
| Documentation & Commissioning | Fees for securing the Work Completion Report (WCR) and necessary DISCOM approvals for subsidy disbursement. | Included in Labour/Net Metering Cost |
The Role of the ₹78,000 PM Surya Ghar Subsidy

The most significant factor influencing how much a 3kW on-grid solar system costs in Rajasthan is the Central Government’s subsidy, designed to boost adoption under the PM Surya Ghar Muft Bijli Yojana.
Subsidy Structure for 3kW Systems
The government provides a fixed CFA, not a percentage of the installer’s quote.
| System Capacity | Subsidy Calculation Breakdown | Total CFA |
| For 3kW | ₹30,000/kW for the first 2 kW (₹60,000) + ₹18,000/kW for the next 1 kW (₹18,000) | ₹78,000 |
How to Avail the Subsidy in Rajasthan
- Registration: Apply on the official PM Surya Ghar National Portal, selecting your state (Rajasthan) and DISCOM (JVVNL/JDVVNL/AVVNL).
- Vendor Selection: Choose a solar installer who is a registered vendor under the scheme and empanelled with your local DISCOM. This is crucial for seamless processing.
- Installation & Commissioning: The vendor installs the system and secures the Net Metering approval from the DISCOM.
- Subsidy Transfer: Once the system is commissioned and approved, the ₹78,000 subsidy is directly transferred to your bank account by the Central Government. You only pay the vendor the net cost (Total Cost – ₹78,000).
Financial Performance: ROI and Savings

While the upfront cost is important, the true metric of value is the Return on Investment (ROI) in a high-insolation state like Rajasthan.
| Financial Metric | Estimated Performance for a 3kW System | Impact on Investment |
| Daily Generation | 12 to 15 Units/day | ~4380 units/year |
| Annual Savings | Assuming ₹7/unit tariff: ₹30,660 per year | Significant reduction in monthly bill |
| Payback Period | 4 to 5 Years (Post-Subsidy) | Rapid recovery of your ₹1.12 Lakh to ₹1.42 Lakh investment. |
| 25-Year Savings | Over ₹7,66,500 (Assuming no tariff increase) | Offers up to 6-7X return on your net investment. |
The consistent, intense sunshine in Rajasthan ensures your 3kW system generates maximum power, making the effective cost after subsidy exceptionally rewarding over the system’s 25-year lifespan.
Conclusion: Maximizing Value for Your 3kW Solar System
The journey to installing a 3kW on-grid solar system in Rajasthan begins with an accurate cost assessment. By understanding that the final price is an aggregate of high-quality panels, a reliable inverter, essential safety components, and installation expertise, you can make an informed decision.
The maximum Central Subsidy of ₹78,000 under the PM Surya Ghar Yojana transforms the initial outlay, positioning solar as a necessity, not a luxury. For the environmentally conscious and financially prudent homeowner in Rajasthan, the current time offers the best blend of low subsidized cost and high energy savings.
By prioritizing accredited vendors and insisting on high-quality components, you ensure your investment delivers decades of clean, free electricity.
Frequently Asked Questions (FAQs) on 3kW Solar System Cost in Rajasthan
Q1: What is the final cost of a 3kW solar system after the PM Surya Ghar Subsidy in Rajasthan?
A: The final effective cost (after the ₹78,000 Central Subsidy) typically ranges between ₹1,12,000 and ₹1,42,000, depending on the quality of panels, the inverter brand chosen, and the specific city’s (e.g., Jaipur, Jodhpur, Kota) installation charges.
Q2: What is the mandatory Central Subsidy amount for a 3kW solar system?
A: The mandatory Central Financial Assistance (CFA) under the PM Surya Ghar Muft Bijli Yojana is ₹78,000 for all residential systems with a capacity of 3kW or more.
Q3: How much space is required for a 3kW solar system on my rooftop?
A: A 3kW system requires approximately 250 to 300 square feet (or 23 to 28 square meters) of shadow-free, south-facing rooftop area. The exact space depends on the wattage and physical size of the individual solar panels used.
Q4: How many units of electricity will a 3kW solar system generate daily in Rajasthan?
A: Due to Rajasthan’s excellent solar irradiation (sunshine), a 3kW on-grid solar system will typically generate between 12 to 15 units (kWh) of electricity per day, averaging around 4,380 units annually.
Q5: Is Net Metering mandatory for the 3kW on-grid solar system subsidy?
A: Yes. The subsidy is only applicable to grid-connected (on-grid) rooftop solar systems. Net Metering, which allows you to export surplus power to your DISCOM (JVVNL/JDVVNL/AVVNL) and receive credit, is a mandatory requirement for commission and subsidy disbursement.
